Also, do use EWL's official download page at http://ewl.bvesg.co.cc/Downloads even though it is not completed at the moment.
I am not sure if you are know it, actually the current release contains various placeholder for Pasir Ris - Bedok station (By ONLY adding a Pasir Ris station without crossover and commented the station commands)
Update: There is some work in progress on curves issue as well as extending to Kallang / Lavender. (But only when up to Bugis OR extended fully to Pasir Ris will the next release officially released)
Appealing to all. Could someone upload the announcement from Kallang to Bugis? Thank you very much. This is because the next release will have up to Bugis. (And possibly merge with the Eastern Extension towards Pasir Ris -- Not confirmed at the moment.)
Originally posted by Samuel Lee:Appealing to all. Could someone upload the announcement from Kallang to Bugis? Thank you very much. This is because the next release will have up to Bugis. (And possibly merge with the Eastern Extension towards Pasir Ris -- Not confirmed at the moment.)
I think Wenjie has it, but try recording the announcements on a LTE train, if you're planning to record.
Thanks to joeyfjj, the recording up to Raffles Place is in place. However, Paya Lebar recording (Which I previously have) must change at a later date (Joey's version got Paya Lebar Interchange...... which the current one dont. But there is no Passengers who are continuing their journey on the Circle Line, please alight.... Paya Lebar Interchange which I expected to have after Apr 17, 2010.)
What I can be sure is that the next release will have exciting underground stations, namely Lavender and Bugis. But I may add something "unexpected" as well, but not sure as of now (The so called 'DT21a' lol!)
I appeal all to provide me a next station Tanah Merah Interchange announcements, from EB and WB (WB is a more priority), thanks. (Maybe this thread should rename to PSR - BGS)
Originally posted by Samuel Lee:I appeal all to provide me a next station Tanah Merah Interchange announcements, from EB and WB (WB is a more priority), thanks. (Maybe this thread should rename to PSR - BGS)
Done. The tread name is now [openBVE] East West Line [WB: PSR to BGS].
I am calling for votes:
Jian Rong and I have a suggestion / idea on the route, as such we would like to hear from other developers and users.
He suggested if possible, the next release will extend to Outram Park instead of Bugis. But due to underground constraints and complexity in City Hall / Raffles Place and lack of announcements after Raffles Place, it is expected that the next release time have to be delayed. Currently, the development of Pasir Ris to Bedok (Shown in today's video) / Bedok to Bugis is basically completed with the need to correct certain distance details.
So which one do you prefer?
1: Release with Outram Park (And of course integrated with Pasir Ris sector), but prepare to wait longer. (Pasir Ris - Outram Park). Expected release time: Varies between August to December 2010
2: Release until Bugis, after integration of Pasir Ris - Bedok route (It must be done in this way) (Pasir Ris - Bugis). Expected release time: Varies between End April / Early May to End June.
Do note that Jian Rong is having PSLE this year, and I am on my Final Year's Project (Year 3 for a Poly student) and I will be graduating at 2011 April, which followed by National Service, I wonder how would I survived then?? Thus, the release date / gap is longer. We seek your kind understanding.
Ok, i have done Uploading the Trip Bedok - Redhill on C151 1056 Car. This Link: http://www.mediafire.com/?m2ajhzdwzii
Edit On 22 - 04 - 2010
Wow 10 Downloads. Hmm Hows The Route Going Now? And Any Feedback on My Recording People?
DELETED
Originally posted by TPS Timothy Mok:DELETED
????
<Probably this guy is talking about his proposed idea to merge with 2 sectors of EWL so as to speed up the entire route development, which can be difficult, because the direction is different.>
Post edited by [ME!]
Originally posted by TPS Timothy Mok:DELETED
Nobody understands your nonsense....Besides, you are not even a developer . Post removed.
Originally posted by Samuel Lee:I am calling for votes:
Jian Rong and I have a suggestion / idea on the route, as such we would like to hear from other developers and users.
He suggested if possible, the next release will extend to Outram Park instead of Bugis. But due to underground constraints and complexity in City Hall / Raffles Place and lack of announcements after Raffles Place, it is expected that the next release time have to be delayed. Currently, the development of Pasir Ris to Bedok (Shown in today's video) / Bedok to Bugis is basically completed with the need to correct certain distance details.
So which one do you prefer?
1: Release with Outram Park (And of course integrated with Pasir Ris sector), but prepare to wait longer. (Pasir Ris - Outram Park). Expected release time: Varies between August to December 2010
2: Release until Bugis, after integration of Pasir Ris - Bedok route (It must be done in this way) (Pasir Ris - Bugis). Expected release time: Varies between End April / Early May to End June.
Do note that Jian Rong is having PSLE this year, and I am on my Final Year's Project (Year 3 for a Poly student) and I will be graduating at 2011 April, which followed by National Service, I wonder how would I survived then?? Thus, the release date / gap is longer. We seek your kind understanding.
I'm going for the 2nd selection. Because, my stand is that we should all quickly finish building the skeletons of the lines.
Originally posted by Samuel Lee:I am calling for votes:
Jian Rong and I have a suggestion / idea on the route, as such we would like to hear from other developers and users.
He suggested if possible, the next release will extend to Outram Park instead of Bugis. But due to underground constraints and complexity in City Hall / Raffles Place and lack of announcements after Raffles Place, it is expected that the next release time have to be delayed. Currently, the development of Pasir Ris to Bedok (Shown in today's video) / Bedok to Bugis is basically completed with the need to correct certain distance details.
So which one do you prefer?
1: Release with Outram Park (And of course integrated with Pasir Ris sector), but prepare to wait longer. (Pasir Ris - Outram Park). Expected release time: Varies between August to December 2010
2: Release until Bugis, after integration of Pasir Ris - Bedok route (It must be done in this way) (Pasir Ris - Bugis). Expected release time: Varies between End April / Early May to End June.
Do note that Jian Rong is having PSLE this year, and I am on my Final Year's Project (Year 3 for a Poly student) and I will be graduating at 2011 April, which followed by National Service, I wonder how would I survived then?? Thus, the release date / gap is longer. We seek your kind understanding.
I Think Option Two is Better? let us try out the Route and Stuff to give u comments before going further down?
Originally posted by Habbo lifehurts-forever:
0.o Blank post?
Originally posted by SBS7322B:0.o Blank post?
Nope Lol was in the process of editing i guess thats y its blank!
Ok, case closed. Since, the majority thinks Option 2 is better, and consider that I have little progress on Bugis - City Hall sector, I will choose Option 2.
The next release is only Pasir Ris - Bugis. (Since Bugis got crossover, realistic mah, like YCK style)
I would integrate The Soon's object for this purpose.
Urgent To dos:
1: Check the rail / track files.
2: The viaducts walls object to be created in order to fill in the gaps left by the station (Or post station objects)
3: The FHPSD's internal doors and external glass / design seriously need a major overhaul. The image is directly ripped from CGA, which is unrealistic.
Originally posted by Samuel Lee:Urgent To dos:
1: Check the rail / track files.
2: The viaducts walls object to be created in order to fill in the gaps left by the station (Or post station objects)
3: The FHPSD's internal doors and external glass / design seriously need a major overhaul. The image is directly ripped from CGA, which is unrealistic.
The 3rd is almost complete :D
Why ah, after the tunnel, my train black black
Originally posted by yellowflip999:Why ah, after the tunnel, my train black black
Huh? Black black? Can post screenshot? Oh, it might be due to the PSD, is a bit too dark. Dont worry, the next object library will tone the brightness.
Otherwise, I put my background as black? (But I thought that was used in the internal LAV - BGS one instead of Test suites in Object Library??)
Originally posted by Samuel Lee:Huh? Black black? Can post screenshot? Oh, it might be due to the PSD, is a bit too dark. Dont worry, the next object library will tone the brightness.
Otherwise, I put my background as black? (But I thought that was used in the internal LAV - BGS one instead of Test suites in Object Library??)
Nonono, the whole train after the tunnel black black! :(!
I mean the short tunnel! :( :( :(!
Originally posted by yellowflip999:I mean the short tunnel! :( :( :(!
No, I did not see such issue. May I know which version (I suppose BDK - ALJ in Bedok - Kembangan tunnel right?) of the route, train and openBVE u are using? Thank you.